Southbend SEZ/3 Manuel d'utilisateur Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 52
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
INSTALLATION SEZ SERIES COUNTERTOP STEAMERS
PAGE 10 OPERATORS MANUAL 1183437
INSTALLATION
Step 4: Water Connection
! WARNING
Do not connect steamer to a hot water line. A hot water connection will damage the steamer.
NOTICE
To meet warranty requirements, the supply water must meet the following specifications:
Pressure 30 to 60 PSI
Total Dissolved Solids (TDS) 60 PPM
Hardness 2 grains or 35 PPM
pH 7.0 to 7.5
Connect a cold water line to the water inlet strainer on the back of the steamer, as shown in Figure 4 on
page 9. The connector on the unit is 1/4" NPT male.
NOTE: To facilitate cleaning, and allow access to rear of unit, flexible connections are recommended. A shut
off valve at (or near) the rear of the unit is highly recommended. See Figure 5 below.
Figure 5
Check
Valve
Filter
Steamer
Cold
Water
Supply
Shut Off
Valve
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 51 52

Commentaires sur ces manuels

Pas de commentaire